Module 8Career and Professional Practice
DAY 85
Project Execution and Deliverables
The piping deliverables produced at each project phase — FEED, detailed design, and construction.
Key Takeaway
FEED produces concept layouts and preliminary material lists. Detailed design produces IFC drawings, isometrics, and MTOs. Construction support includes RFIs, site queries, and as-built updates.
Relevant Standard: ISO 10628
Quick Quiz
What does IFC stand for in the context of engineering drawings?