All lessons
Day 85 / 90
Module 8Career and Professional Practice
DAY 85

Project Execution and Deliverables

The piping deliverables produced at each project phase — FEED, detailed design, and construction.

Key Takeaway

FEED produces concept layouts and preliminary material lists. Detailed design produces IFC drawings, isometrics, and MTOs. Construction support includes RFIs, site queries, and as-built updates.

Relevant Standard: ISO 10628
Quick Quiz

What does IFC stand for in the context of engineering drawings?