All lessons
Day 70 / 90
Module 6Equipment Piping
DAY 70

Drain and Vent Systems

How to design drain and vent systems for process piping.

Key Takeaway

All piping must be drainable and ventable for hydrostatic testing, maintenance, and decommissioning. Low points need drains; high points need vents. Drain and vent sizes are specified in the piping class.

Relevant Standard: ASME B31.3
Quick Quiz

Why must all piping systems have drain and vent connections?